AIA Contract - Articles & Sub-sections
AIA A201 - 1997 General Conditions of the Contract for Construction
Sample A201 Document
Available at: http://academics.triton.edu/faculty/fheitzman/A201%20-%20General%20Conditions.pdf
Table of Contents
Article 1 - General Provisions
1.1 Basic Definitions
1.1.1 The Contract Documents
1.1.2 The Contract
1.1.3 The Work
1.1.4 The Project
1.1.5 The Drawings
1.1.6 The Specifications
1.1.7 The Project Manual
1.2 Correlation and Intent of the Contract Documents
1.3 Capitalization
1.4 Interpretation
1.5 Execution of Contract Documents
1.6 Ownership and Use of Drawings, Specification and Other
Instruments of Service
Article 2 Owner
2.1 General
2.2 Information and Services Required of the Owner
2.3 Owners Right to Stop the Work
2.4 Owners Right to Carry out the Work
Article 3 Contractor
3.1 General
3.2 Review of Contract Documents and Field Conditions by
Contractor
3.3 Supervision and Construction Procedures
3.4 Labor and Materials
3.5 Warranty
3.6 Taxes
3.7 Permits, Fees and Notices
3.8 Allowances
3.9 Superintendent
3.10 Contractor's Construction Schedules
3.11 Documents and Samples at the Site
3.12 Shop Drawings, Product Data and Samples
3.13 Use of Site
3.14 Cutting and Patching
3.15 Cleaning Up
3.16 Access to Work
3.17 Royalties, Patents and Copyrights
3.18 Indemnification
Article 4 Administration of the Contract
4.1 Architect
4.2 Architect's Administration of the Contract
4.3 Claims and Disputes
4.4 Resolution of Claims and Disputes
4.5 Mediation
4.6 Arbitration
Article 5 Subcontractors
5.1 Definitions
5.2 Award of Subcontracts and Other Contracts for Portions of the
Work
5.3 Subcontractual Relations
5.4 Contingent Assignment of Subcontracts
Article 6 Construction By Owner or by Separate
Contractors
6.1 Owner's Right to Perform Construction and to Award Separate
Contracts
6.2 Mutual Responsibility
6.3 Owner's Right to Clean Up
Article 7 Changes in the Work
7.1 General
7.2 Change Orders
7.3 Construction Change Directives
7.4 Minor Changes in the Work
Article 8 Time
8.1 Definitions
8.2 Progress and Completion
8.3 Delays and Extension of Time
Article 9 Payments and Completion
9.1 Contract Sum
9.2 Schedule of Values
9.3 Applications For Payment
9.4 Certificates for Payment
9.5 Decisions to Withhold Certification
9.6 Progress Payments
9.7 Failure of Payment
9.8 Substantial Completion
9.9 Partial Occupancy or Use
9.10 Final Completion and Final Payment
Article 10 Protection of Persons and Property
10.1 Safety Precautions and Programs
10.2 Safety of Persons and Property
10.3 Hazardous Materials
10.6 Emergencies
Article 11 Insurance and Bonds
11.1 Contractor's Liability Insurance
11.2 Owner's Liability Insurance
11.3 Project Management Protective Liability Insurance
11.4 Property Insurance
11.5 Performance Bond and Payment Bond
Article 12 Uncovering and Correction of Work
12.1 Uncovering of Work
12.2 Correction of Work
12.3 Acceptance of Nonconforming Work
Article 13 Miscellaneous Provisions
13.1 Governing Law
13.2 Successors and Assigns
13.3 Written Notice
13.4 Rights and Remedies
13.5 Tests and Inspections
13.6 Interest
13.7 Commencement of Statutory Limitation Period
Article 14 Termination or Suspension of the Contract
14.1 Termination by the Contractor
14.2 Termination by the Owner for Cause
14.3 Suspension by the Owner for Convenience
14.4 Termination by the Owner for Convenience
Another part of the "Language" of the construction project can be
found in the
Construction Specifications Institute (CSI) - Master Format
This organizes the technical specifications portion of the
Contract Documents into 16 Divisions as follows:
Divison 1 - General Requirements
Division 2 - Site Work
Division 3 - Concrete
Divsion 4 - Masonry
Division 5 - Metals
Division 6 - Wood & Plastics
Division 7 - Thermal & Moisture Protections
Division 8 - Doors & Windows
Division 9 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 13 - Special Construction
Division 14 - Conveying Systems
Division 15 - Mechanical Systems
Division 16 - Electrical Systems
|