BMATWT 452 - Building Materials Computing

 

Home
Course Syllabus
Assignments
Lecture Outlines
Readings
Contact

BMATWT Home
BMATWT Courses


   

Homework Assignment 2


Estimating Spreadsheets

Due by class time February 13

In the first two Material and Take-Off lectures we introduced the General Requirements Section of the Frank Walker estimating book.

We created general spreadsheets for:

1) Estimating Equipment Rental Rates

2) Calculating Labor Costs for moving aggregate materials

3) Estimating Carpentry Labor Costs for Sheathing

Provide a spreadsheet or spreadsheets that contain these estimates.

NOTE: Make sure to add a PROFIT line on each of these, and use a PROFIT rate of 15%.

Please use formulae wherever feasible. This will increase the utility of this spreadsheet for future use.



 

Produced and maintained by David T. Damery
Building Materials and Wood Technology
Department of Natural Resources Conservation
College of Natural Resources and the Environment
University of Massachusetts, Amherst.


   
             
Many of the materials created for this course are the intellectual property of the instructor. This includes, but is not limited to, the syllabus, lectures and course notes. Except to the extent not protected by copyright law, any use, distribution or sale of such materials requires the permission of the instructor. Please be aware that it is a violation of university policy to reproduce, for distribution or sale, class lectures or class notes, unless the faculty member has explicitly waived copyright. Copyright 2007, David T. Damery