| Week of | Activity | What's due? (to Prof. Tyson by e-mail) | Group # | Background Topic | Technique |
| 7-Sep | Recruit and register | 1 | As in soil: phytoremediation | ICP-MS | |
| 12-Sep | Recruit and register | 2 | As-containing herbicides | ICP-OES | |
| 19-Sep | Recruit and register | 3 | CCA wood | Portable XRF | |
| 26-Sep | Kick-off meetings | 4 | As in water: the Bangladesh situation | Solution spectrophtometry | |
| 3-Oct | Work on background | 5 | As in food | HG-AFS | |
| 10-Oct | Work on background | Background paper: midnight 10/16 | 6 | As containing animal feed supplements | HG-AAS with QTA |
| 17-Oct | Work on how to measure | 7 | As in water: the US situation | Field test kits based on the Gutzeit reaction | |
| 24-Oct | Work on how to measure, | How to measure As: midnight 10/30 | 8 | As microbiology, biological methylation | AAS with ETA |
| 31-Oct | Last day to drop with W: 10/31. Work on proposal. Each group measures 2n samples | Brief report on participation: 11/6 | 9 | As human toxicity | HPLC |
| 7-Nov | Project meeting 11/7. Work on proposal | Proposal: midnight 11/13 | 10 | As in embalming fluids | Dissolving solid samples |
| 14-Nov | Work on project | 11 | As pharmaceuticals | GC | |
| 21-Nov | Work on project | ||||
| 28-Nov | Project meeting 11/28. Work on project | ||||
| 5-Dec | Work on project | ||||
| 12-Dec | Project meeting 12/12. Work on project. Last classes 12/14 | The report on the background material should be about 500 words long and contain 7-10 links to websites of relevance. | The report on the measurement technique or procedure should be about 500 words long and contain at least one diagram and 2 links to relevant websites. | ||
| 19-Dec | Work on project | Project report. Report on group participation. Report on value of experience: midnight 12/23 | The proposal should be about 750 words long. |